Construction of Roadbed, Minor & Major Bridges KM 00.00 and KM.28.00 in connection with new B.G Electrified line Railway Track in the state of chhattisgarh over south east central railway between Gharghoda and Gare-Pelma.

Construction of civil works up to formation for double line railway involving formation in embankments/cuttings, blanketing, minor bridges & RUBs (excluding those already awarded to other contractors) Retaining walls, Drains, Ground Improvement works, relocation of existing roads etc. from DFC Ch.151+000 (IR 118.360) to DFC Ch 162+600 (Excluding 4Km stretches, not likely to be handed over) and DFC Ch. 162+600 to DFC Ch. 176+240 (IR 140/27-29), in connection with construction of Western Dedicated Freight Corridor, Phase II (Vaitarana–Sachin Section) for sub packages SS2 B & SS2C (Combined) in Maharashtra State.

Earthwork in embankment/cutting for formation, Construction of Bridges and Allied Works in connection with construction of Railway Sliding and exchange Yard for (4×270 MW) BTPS, Manuguru, Bhadradri Kothagudem District.

Proposed Construction of Road Over Bridge as

Over Burden Removal work at Aditya Cement works, UTCL, Sambhupura

Over Burden Removal work at Rawwan-Jhipan

TSGENCO-(5x800 MW) YTPS–Earthwork in Railway formation (Embankment & Cutting); Construction of Minor & Major Bridges including ROR at KM. 133.900 of VNUP-BN section of SC Railway; Supply of PSC sleepers, Points & Crossings, P-way Fittings including Track Ballast; Track Linking; Over Head Electrification (OHE) and other allied works for the proposed BG Railway Siding of Yadadri Thermal Power Station at Veerlapalem village of Damaracherla Mandal, Nalgonda District, Telangana.

P-way works for Barsuan Station at Kurmitar Mine, Sundargarh, Odisha.

Nimach-Ratlam Doubling work: Composite tender for Execution of various works in Nimach (Km 241.54)-Dalauda (Km 305.15) section for doubling of Railway Line involving (I) Engineering works in yards and (ii) Signalling, Telecom, Electrical & TRD works in yards and mid-section, with scope of work as mentioned in the tender document.

Construction of proposed private siding for setting up of a new gct (Gati Shakti Terminal) taking off from nalli station on virudunagar-vanchi maniyachchi section, Madurai-Sr

Construction of proposed private siding for setting up of a new gct (Gati Shakti Terminal) taking off from nalli station on virudunagar-vanchi maniyachchi section, Madurai-Sr

Civil work for Road & Drainage USO-2

Execution of Civil Engineering works of Viaducts, Major Bridges, ROBs, Suppply of site Vehicles, site facilities & other allied works between km 143 to 184 (172(29 route km+12.108 long chainage+41.1 km) of khurda Road-Bolangir new BG rail link project of E.Co Railway.
Execution of Civil Engineering works of Viaducts, Major Bridges, ROBs, Suppply of site Vehicles, site facilities & other allied works between km 143 to 184 of khurda Road-Bolangir new BG rail link project of E.Co Railway Operation of Non-Schedule Item No. 4 to 6.

Construction of Major Bridge no.289, 290,305, 315 & 3378
Proposed construction of Road Under Bridge (RUB) No.310AA at Km.221.385(1x5.5mx5.0m) RCC Box, RUB No.316A at Km.226.290(1x5.50mx5.0m) RCC Box and RUB no.339 at Km.247.055 (2x5.5mx5.5m)RCC Box and diversion road.

Earth work in Railway formation including filling and cutting, blanketing, construction of minor bridges and Panel building for proposed Railway siding at Mungoli-Nirguda open cast mine of Wani area for M/s.WCL(Package-II).

Provision of four Orp blast pens with link taxi track and allied works at AFS Chabua.

SH-63, Chendipada Road, Jindal Nagar Angil-759111, Orissa.

Design, Supply, Erection, Testing & Commissioning of 25 KV, 50 Hz, Single Phase, OHE Traction System of Bhalumuda-Gare Pelma Spur-2 section and associated works in Connection with New BG Electrified Rail Corridor in the State of Chhattisgarh Over South East Central Railway.

Supply of P way materials

1. Preparation of FSR, DPR, SIP and Obtaining approval from Railways
2. Motorization of Manual Hand points (28 Nos)
3. Interface & linking of existing Motorized Hand points (12 Nos)
4. Revamping of LC & Installation of Boom Barrier (3 Nos)
5. Supply & Installation of Dead-End Buffers (2 Nos)
6. Construction of GDR Pathway (1000 RMT)
7. Construction of LC Goomty Building (2 Nos)
The above work shall be done on end-to-end / turnkey basis

Civil and Structural works for Limestone handling system(LHS) area for installation of steam and power plant for 5th streat Alumina Refinery expansion under Phase-3 Expansion of M & R Complex, Damanjodi.

Manufacturing, Supplying, fabrication, erection and launching of Steel Girder for Major Bridge No. 34 (Old)/ 40 (New) (Span 4x30.5m Open Web Girder) over Kelo River at Ch 27519m (near Pelma) on Spur line between Bhalumuda (Km 13.375) and Gare Pelma (30.668) section in connection with the construction of New BG Electrified Railway Line of East Corridor-I between Kharsia (Km-0) to Dharamjaigarh (Km-74.0) with a Spur from Gharghoda to Gare Pelma in the State of Chhattisgarh over South East Central Railway.

Proposed construction of "Road Under Bridge" (four lane) of size2x9.50x5.5m(min.) RCC Box at Rly.Km. 175/39 to 176/1 at Sanathnagar Station yard approaches towards Secunderabad end. (SW-II): Secunderabad-Wadi Section-Proposed Rebuilding of RUB No.244 as 2 nosof 1x11.00mx5.50m(Min.VC) clear HT RCC Box by boxpushing (33.495m (Sk) length & cast-in-situ (7.605 (sk))length skew 15 towards MG road in lieu of exg. RUBNo.244 of span 1x11.99m(sk) at KM.192/31-33 near Ranigunj between James street and Secunderabadstations.

Design, drawing, supply, erection and commissioning of 25kv Railway electrification work including modification of existing signle phase OHE for proposed railway siding at Mungoli Nirguda Open cast mine of Wani area Dist Chandrapur, Maharashtra.

Railway Siding job comprising of Pway and OHE for Maratha Site.

Railway Siding job comprising of Pway and OHE for Salai Banwa Site.

Hiring of equipment for MH at Aditya

Construction of HL major bridge across river Baitarani at km.105.080 and rehabilitation bridge across river Deo at km 90.850 of NH-220 in the state of Odisha on EPC mode.
Railway connectivity to Jindal Paradip Port Limited taking off within Paradip Port premises under Khurda Road Division of East Coast Railway (ECoR).
Contruction of Bridge NO.2(1x12.2M Plate girder foundation) for Western Dock Railway Project at Paradip port.

Laying Strata Web HD Geocell & PP Non-Woven Geotextile for Western Dock Railway Projectat Paradip.

Civil works & P way works for development of Railway infrastructure from KDTR Railway station to Adani Power Limited-Raigarh Thermal Power Plant CG.

Hire charges 40t primary rock bkr, Excavator.

Provision of longer loop line atChegunta, Kalamalla, Pattakottacheruvu, Bantanahal and Nandaluru- OHE modification works.

Cement manufacturing division mumbai.

Removal of Overburden/Waste from KWC Mines

Complete Track renewal (CTR) work at GNFC Railway Siding Phase-II.

1 x 800 MW Dr.NTTPS Thermal Power Station-Letter of Intent (LOI) for Execution of Railway siding work


Construction of Railway bed, bridges, track linking in connection with development for Sast-Pandharpauni line to facilitate coal evacuation from proposed CHP/SILO at Sasti Ballrpur area WCL on Manikgarh-Gadchandur section of South central Railway.

Supply and execution of P-way work

Execution of P-way work

Package-I, i.e., Earthwork in formation, Construction of Bridges, Buildings, Supply of Sleepers and Permanent Way materials, Linking of Railway track and allied works for proposed KK-1 private Railway siding taking off from Bellampalli Station in Kazipet-Balharshah section, Mandamarri area, Mancherial Dist. Telangana.

Composite contract for raising of 50,000 tons of finished products by installing two own nos of crushers of 100tph capacity each and raising and transporting an additional 10,000 tonns ROM lime stone boulder to feed departmental crusher No-1 per month from Duarsini Lime stone Quarry of BSLC Mines, Birmitrapur.

Guntakal Division-Electrification of TM sidings/Ballast sidings/PQRS sidings for 35 station yards of GTL division.

Retrofitting & Rehabilitation of existing foot over bridge (FOB) on Ghuggus Railway Siding of WCL Wani areaunder Nagpur Division of Central Railway in state of Maharashtra.

Supply & Erection of P-way works & OHE

Site & Infrastcture Contract-II for alternative arrangement for souring of Bauxite from Panchapatmali mine for stream-5 of Alumina refinary, M & R Complexat Damnajodi, Odisha.

Kacheguda: Construction of newbridge of span 18x12.2M PSC slab on Moosi River (Inconnection with the work of Extension of Shunting neckfrom existing 526 mtrs to 730 mtrs duly constructing bridge on Moosi River (Dhone end) on Secunderabad-Dhone section).

Earth work in formation including filling, cuttingand compaction, supplying and laying blanketing material onembankment, extension of existing minor bridges by RCCBox/PSC slab, misc. civil engineering works i.e. Platform work, Building works and any other ancillary works andConstruction of sub structure of Major Bridge No. 76 and 77 between Jaunpur and Zafrabad Section in connection with Doubling of Jaunpur Junction-Zafrabad of Lucknow Divisionon Northern Railway".

Supply & execution of P-way works, OHE and S & T works

No. 14, Dr. Giriappa Road, T.Nagar, Chennai-600 017. INDIA. Tel: +91-44-66291000 / 66291150, Email: info@rkm.inPlant Office: Village Uchpinda, P.O. Dhurkot, Via Chandrapur, Tehsil-Dabra, Sakti District, Chhattisgarh-495 692.
Supply and Construction of Civil works for the proposed railway siding, which will take off from the Kharsia station division of S.E.C. Railway.

1 x 800 MW Dr. NTTPS Thermal Power Station – Letter of Intent (LOI) for Supply of Rails, Sleepers & Ballast.
BGR Energy Systems Limited., Corporate Office:443, Annasalai,Teynampet, Chennai-600 018. Works: Dr.NTTPS, Stage V, Ibrahimpatnam, Krishna Dist, AP.
1 x 800 MW Dr. NTTPS Thermal Power Station – Letter of Intent (LOI) for Supply of Rails, Sleepers & Ballast-Reg.

Construction of Rail Over Bridge (ROB) to connect to the Coastal berth and landing jetty at J N Port in the State of Maharashtra under EPC mode

Londa-Miraj section-Construction of ROB at Km.613/800-900 inlieu of LC No 392 between Belagavi-Sambre stations as 1x36mComposite Girder clear span ( Railway Portion) with 5x18.71m PSCGirder (NH end) and 6x18.71 m PSC girder (Mutaga end) and CCblock in approaches between Belagavi and Sambre stations.(CompositeWork)

For Construction of ROB in Lieu of LC No.56 at Km: 92/600-700 with1x30m composite Girder and 3x20m PSC Girder (Bengaluru-Honnavara Highway) +4x20m PSC Girder (Benchagere village) +RCCRetaining wall (Approach span) between Nittur-Gubbi Stations in TK-ASK Sections. (Composite Tender)

Letter of intent (loi) for construction of 5th railway track in plant yard for m/s rccpl takes-off from Kundanganj station under northern railway.

Engineering, procurement, construction (epc) for supply, erection, testing & commissioning of 2x25 kv 50hz traction overhead equipment, traction sub station, switching stations and scada for railway electrification of double line and other associated modification works of the existing ohe of single line and yards in connection with doubling between ankai station (excl) at 16.00 km and karanj gaon (excl) at 69.01 km (i.e., 53.01 km) on nanded division of south-central railway in maharashtra state, India.

Demolition and reconstruction of technical building at nad visakhapatnam under ge (p) navy visakhapatnam.

Engineering, procurement and construction (epc) of deficient perimeter wall, security infrastructure, perimeter road along with street lights at defence land bengaluru.

Permanent way, washable apron and associated civil works at new railway siding, devangonthi installation, Bangalore.

Construction of Bridge No n2 (1*12.2M) Plate Girder including Foundation) for Western Dock Railway Project Port

Development of Infrastructure Facilities (Bulding & Services) JNTUH-Khammam